HAMM Construction- University Heights Stormwater Pond, Trunk and Outfall
The University Heights Stormwater Pond, Trunk and Outfall project was completed for the City of Saskatoon.
» 20 lineal meters of 1800mm concrete pipe
» 780 lineal meters of 1500mm concrete pipe
» 75 lineal meters of 1050mm concrete pipe
» Average depth of pipe was 7-9 meters
» Pond excavation consisted of 215,000 cubic meters of dirt moved
» New outfall at the South Saskatchewan River included a complete riverbank restoration
click to enlarge click to enlarge
|
|