Evergreen Primary Fill Main

Evergreen Fill Main

Saskatoon, Saskatchewan

This intricate primary water supply line was built to support a third water reservoir in Saskatoon. Upon completion of the future Evergreen Reservoir, the East side will have the capacity to sustain water supply levels for municipal use. This project involved approximately 700 meters of 1050mm PVC water main throughout urban areas, including tie-ins at four points and a phased open-cut crossing of McOrmond Drive. Specific scopes of work included:

  • Installed 700 meters of 1050mm PVC primary water main
  • 370 meters of 200mm temporary water installation
  • Self-performed flushing, pressure test and chlorination
  • Construction of 4 Valve Chambers