City of Saskatoon 750mm PVC Sewage Forcemain

Blairmore Sewage Forcemain

Saskatoon, Saskatchewan

On this project auger bore methods were utilized in order to cause minimal disturbance to surrounding business operations in Saskatoon’s Industrial Sector. Specific scopes of work included:

  • 12,264 meters 750mm PC165 PVC Pipe
  • 612 meters of Road and Rail Crossings using Auger Bore Method
  • 662 meters of Gravity Sewer Pipe to an average depth of 9 meters