City of Regina 1050mm Steel Pipe Waterline Expansion

Buffalo Pound Raw Water Supply Line

Buffalo Pound, Saskatchewan to Regina, Saskatchewan

Ensuring reliable delivery of raw water to Regina’s water treatment facility, this project included construction of large diameter steel pipe installed by the means of multiple cranes. Specific scopes of work included:

  • 19,260 meters of 1050mm Steel Pipe
  • 6 Large Tunnel Crossings
  • 1 Creek Crossing