Kneehill Regional Water Supply Pipeline
Kneehill Water Supply Line
Kirkpatrick Reservoir to Acme, AB
This contract included over 54km of water main through difficult rocky terrain featuring extremely volatile grade elevations as this water supply line was constructed through valleys. Specific scopes of work included:
- 3,125 meters of 400mm Steel Pipe
- 775 meters of 400mm Special Class 51
- 12,100 meters of 400mm PC350 Ductile Iron Pipe
- 6,900 meters of 400mm PC300 Ductile Iron Pipe
- 14,600 meters of 350mm PC300 Ductile Iron Pipe
- 8,150 meters of 350mm PC350 Ductile Iron Pipe
- 5,750 meters of 150mm PC235 PVC Pipe