Olds to Bowden

Water Supply Line

Olds, Alberta to Bowden, Alberta

The project involved the installation of a transmission line in Alberta, working close to Highway 2A. Hamm Construction Ltd. utilized both open-cut and horizontal directional drill methods and self-performed all auger boring for the project. Included in the work was:

  • 18,924 lineal meters of 550mm HDPE transmission line
  • 13,624 lineal meters of 600mm FPVC transmission line
  • 1,130 lineal meters of horizontal directional drill crossings of roads and wetlands
  • 3 CP rail trenchless auger bore crossings
  • 5 Isolation valves
  • 3 Combination air valve vault chambers