The project involved the installation of paralleling water and sanitary transmission lines adjacent to Highway 2A. Hamm utilized both open-cut and horizontal directional drill methods while self-performing all Auger Bores for the project. Specific scopes of work included:

  • 18,924 lineal meters of 550mm HDPE transmission line
  • 13,624 lineal meters of 600mm FPVC transmission line
  • 1,130 lineal meters of Horizontal Directional Drill Crossings of roads and wetlands
  • 3 CP rail trenchless Auger Bore crossings
  • 5 Isolation valves
  • 3 Combination Air Valve Vault Chambers