The project involved the installation of a transmission line in Alberta, working close to Highway 2A. Hamm Construction Ltd. utilized both open-cut and horizontal directional drill methods and self-performed all auger boring for the project. Included in the work was:
- 18,924 lineal meters of 550mm HDPE transmission line
- 13,624 lineal meters of 600mm FPVC transmission line
- 1,130 lineal meters of horizontal directional drill crossings of roads and wetlands
- 3 CP rail trenchless auger bore crossings
- 5 Isolation valves
- 3 Combination air valve vault chambers