Water Main Preservation #1

Water Main Preservation

Saskatoon, Saskatchewan

Located throughout four individual phases scattered around the city, mobilization and demobilization of assets was a common occurrence during the project. All locations varied in terms of soil type, site layout and truck cycle times as Hamm leaned on its experience to complete the contract. Specific scopes of work included:

  • Replaced 1,105 meters of 150mm to 250mm PVC water main
  • 143 services reconnected to new underground infrastructure
  • Temporary water lines designed to avoid roadway injection points
  • Trenchless watermain installation beneath high pressurized gas line